Languages:Chinese  |   Sitemap  
西电集团

 China Yangtze Three Gorges Project2010-10-09
 The first EHV 750kV AC transmission and distribution demonstration project in China2010-10-09
 The first ±800kV UHVDC transmission project in the world2010-10-09
 The first UHVAC transmission and distribution demonstration project in China2010-10-09
 National “West-to-east power transmission” etc key power grid projects2010-10-09
 Electric railway project2010-10-09
 Production line of galvanization and zincification2009-08-14
 Tank welding2009-08-14
 CNC center2009-08-14
 Assembly, 3D storehouse2009-08-14
 Large scale epoxy resins casting line2009-08-14
 4-point bending test2009-08-14
 Linear cutting equipment2009-08-14
 Constant-temperature high-speed burner shuttle kiln2009-08-14
Total 1 Pages  next  previous  GoTo  Page 
Contacts  |  Sitemap  
 
Copyright 2009 CHINA XD GROUP All rights reserved
ADD: No.7 TANGXING ROAD, XIAN, P.R.CHINA P.C: 710075 陕ICP备05000686号
TEL:(029) 88832222 FAX: (029) 84242679 E-mail: xdnet@xd.com.cn