Materials for the Records of Earthquake Relief Work

I.Cases of Earthquake Relief Work
In the afternoon of May 12, 2008, a strong earthquake of magnitude 7.8 happened in Wenchuan County of Sichuan Province. In the provinces or cities like Sichuan, Chongqing, Shaanxi and Gansu, part of electric facilities were damaged to various degrees.
From May 12 to 14, our China XD Group’s sales companies in Chengdu, Lanzhou and Chongqing continuously received the calls crying for help from the customers in Sichuan, Gansu and Chongqing, which said that the equipment of local transformer substations were damaged and caused power cut so they needed emergent relief. After receiving the calls, the XD Group’s leading team of earthquake relief delegated wok immediately by organizing the Xi’an XD Transformer Co., Ltd., Xi’an XD High Voltage Porcelain Co., Ltd., Xi’an XD Power Capacitor Co., Ltd. and XD Lightning Arrester Co., Ltd. to prepare relief equipment and spare parts with the fastest speed and inform emergency service team members to get ready to leave at any time.
On May 14, the first group of electric equipment for earthquake relief sent to the disaster areas by China XD Group started to be transported. These equipments were valued about RMB 800,000 Yuan, including: 4 bushing shells of 220kV transformer, 1 bushing shell of 110 kV transformer and the spare parts, which were sent to Zaoyang 220kV Transformer Substation at Biri Town, Wen County, Longnan Region of Gansu Province; 3 capacitive
pressure transformators of 500kV, four 220kV capacitor voltage transformers and three 500kV zinc-oxide arresters, which were sent to Zipingpu Transformer Substation at Dujiangya, Sichuan Province.
 
The First Record of XD Group’s Emergency Repairs:
1. XD Zipingpu Hydropower Station in Sichuan
Zipingpu Key Water-control Project, located in the Minjiang River and at the juncture of Dujiangyan City and Wenchuan County, is one of the ten symbolic projects which were first started in China’s west development.
In the evening on May 13, Chengdu Branch of XD Sales Company received the call from Zipingpu Earthquake Relief Headquarter which cried for a group of capacitive
pressure transformators of 500kV and a group of lightning arresters of 500kV. Under the powerful command of the relief leading team, every company of XD Group prepared the materials through the night and sent them out at the night of May 14. They overwhelmed all the difficulties on the way and delivered the products needed to the construction sites on May 15.
Ma Xiaofeng, the manager of Chengdu Branch, leading 7 people including Li Bin and Zhang Ke of Xi’an XD Power Capacitor Co., Ltd., Yan Yong of Xi’an XD Lightning Arrester Co., Ltd., etc, hurried to Dujiangyan Zipingpu Hydropower Station and did the emergency work, such as installation and adjustment. On their way, they received again the call from Zipingpu Company which asked for help. Because the Japan Mitsubishi was not willing to provide their service on the site, the damaged 500kVGIS could not be repaired. They hoped our company could send experts to the site. Hearing this, Tian Yian, the general Manager of XD Sales Company contacted the leaders of Xi’an XD High Voltage Apparatus Co., Ltd. According to the Group’s earthquake relief work leaders’ instruction, they would try to meet all the customers’ needs with every effort at any cost. Xi’an XD High Voltage Apparatus Co., Ltd. organized quickly a rush-repairs group with Wang Jianxi, the assistant chief engineer, as the leader. In the early morning of May 16, at the risk of aftershocks, the group members flied to Chengdu from Xi’an, Shijiazhuang and Xiamen, and arrived at Zipingpu construction site at 5:00 pm.
The rush-repairs group began to examine the site as soon as they got there. They studied the repairs plan with related workers and did the tense repairs and examinations through the night. Everybody carried forward the spirit of no fear of fatigue and continuous working and struggled in the workshops at the risk of so many aftershocks. Till 3 o’clock in the midnight, they finished the preplanned work. The next day, they did trace monitoring on the site. At 17:52 on May 17, Zipingpu Hydropower Station restored power supply for Sichuan electric network and by 22 o’clock, 3 machine sets are generating online. Up to May 19, the hydropower station had gone through 24-hour operation at full load.
Zipingpu Hydropower Station’s being combined to the grid effectively promoted the discharge capacity of Zipingpu dam, which played an important role in keeping the safety of the dam, the water supply of Chengdu Plain and the electricity supply for the earthquake relief work in Sichuan.
During the earthquake relief work at Zipingpu Hydropower Station, our company sent 2 trucks into Dujiangyan, the harder-hit area, from Chengdu for 5 times in 3 days, and 16 persons went into the site of relief one after another. Through the task, we could not only finish quickly the replacement service of our XD Complex’s own products, but also fully reflect our XD Group’s social responsibility. Thanks to our strong technical expertise, we had the readiness to take over responsibility and accomplished the rush repairs of 500kVGIS delegated by Zipingpu Company. We won honour for China XD Group and great acclaim from Sichuan provincial government, the Ministry of Water Resources and Zipingpu Hydropower Station as well.
 
The First Record of XD Group’s Emergency Repairs:
2. XD Zipingpu Hydropower Station in Sichuan
From the night of May 13 when XD Company received the calls for relief from the Zipingpu Earthquake Relief Headquarter to 17:52 on May 17 when Zipingpu Hydropower Station restored power supply for Sichuan electric network, in the 4 days, our XD Group sent 2 trucks of relief power equipment into the harder-hit area Dujiangyan from Xi’an and 16 emergency employees went to the site of relief. We could not only finish quickly the replacement service of our XD Company’s own products, but also, thanks to our XD’s strong technical expertise, accomplished the rush repairs of 500kVGIS delegated by Zipingpu Company with the readiness to take over responsibility, which fully reflects our XD Group’s style of central enterprise with the courage to shoulder social responsibility.
On May 20, we received the letter of thanks from Zipingpu Hydroelectric Plant. It reads as follows.
 
 
A Letter of Thanks
 
China XD Group:
On May 12, 2008, a strong earthquake of magnitude 8.0 happened in Wenchuan, Sichuan Province. A group of 500kV lightning arresters and line voltage transformers in Zipingpu Hydroelectric Plant of Sichuan were damaged, and the plant electrical output was cut off completely. After the occurrence of the earthquake, the plant contacted Ma Xiaofeng, the manager of Chengdu Sales Branch, in time. Receiving our call for relief, your company organized relevant technicians and deployed repair equipment and materials immediately, and sent them to our plant through the night. They examined and repaired the GIS equipment very carefully. Being eager to meet the needs of our plant, Manager Ma Xiaofeng and the technicians in your company kept
working overloadingly day and night with no fear of difficulty in order to restore the plant’s production. They accomplished their task splendidly by repairing the equipment and clearing up the equipment problems one after another. They gave full scope to your company’s style of rangers which is indomitable, tenacious and able to endure hardship and battles. They made an important contribution to Zipingpu Hydroelectric Plant’s restoration of power supply. And you all have written a magnificent poem of one family with hard work.
With your company’s technicians’ great collaboration and efforts in 5 days, the split generator sets combined to the grid at 19:52 on May 17, which relieved the power shortage in the earthquake relief work at present and eliminated the potential threats on the dam caused by the long-period operation of the flood discharge installation. Now, we Zipingpu Hydroelectric Plant of Sichuan Province would sincerely express our heartfelt thanks and
highest respect to your company.
 
The Second Record of XD Group’s Emergency Repairs:
Zaoyang Substation at Bikou, Longnan, in Gansu
 
In the afternoon of May 14, Li Qingchun, the manager of Lanzhou Branch of XD Sales Company, leading 3 trucks in which carried the first group of power equipments sent to the earthquake area and emergency service employees, rushed to Cheng County Transformer Substation of Gansu and Zaoyang Transformer Substation at Bikou, Longnan to give relief.
In the afternoon of May 19, Cao Zhi’an, the Deputy General Manager, and Li Qinglin, Chief Safety Supervisor of the
State Grid Corporation of China, Sun Peijing, the General Manager of the Northwest Grid Corporation of China, and Xiao Chuangying, the General Manager of Gansu Grid Corporation, came to inspect the power plant. They expressed their satisfactions to the present repair speed, praised the organization of the Northwest Grid Corporation of China and other companies, and bowed deeply to the rescue personnel on the site enduring high temperature.
On May 23, we received the letter of thanks from Gansu Electricity Company, which said that all the
administrative villages of Gansu disaster area had restored normal power supply and Gansu Grid had achieved staged success in the relief work. Thus far we had accomplished successfully our task of relief on the site at Cheng County Transformer Substation of Gansu and Zaoyang Transformer Substation at Bikou, Longnan.
 
 
 
The Third Record of XD Group’s Emergency Repairs:
Anxian County 220kV Substation at Mianyang
 
At 9:54 am on May 14, Chongqing Branch of XD Sales Company received A Letter for Relief after Earthquake from Xi'an Electric Manufacturing Complex, and then delivered it at once to every relevant department of Chongqing Electricity Company. Every department showed
deep gratitude to the help of XD Complex as well as telling that Chongqing power network was not damaged seriously and still worked normally.
In the evening of May 15, Chongqing Branch received the call from Chongqing Electricity Company, who asked for breakers below 220kV, isolating switches, pressure transformators,
current transformators, parallel capacitors, lightning arresters and  pillar products to help build An County 220kV Substation at Mianyang, Sichuan. And they hoped the goods could be delivered within 30 days. After our exchanging information with them, various companies declared positively that they would try hard to deliver the relief goods.
On May 18, arriving at the construction site, we saw the whole substation was damaged seriously with the
collapsed main control building, displaced 220kV extra voltage transformator, collapsed and broken arc-extinguishing chamber of 220kV breakers (including 3 from ABB and 2 from Henan Pinggao Electric Co., Ltd.),2 groups of fallen isolating switches (from Xi’an XD High Voltage Apparatus Co., Ltd), other 15 groups looked sound, crooked pressure transformator (from Xi'an XD Power Capacitor Co., Ltd.), leaning and oil-leaking current transformator (from Liling Electric Co., Ltd.) and crooked and collapsed lightning arresters (from Fushun High Voltage Porcelain Co., Ltd). After recording the 220kV products in detail, we examined the 110kV products of which the current transformators were damaged the most seriously with 8 of them crooked and leaked oil. Every one was deeply honored to see two LW25-126 breakers produced by XD Complex stood there safe and sound. After the inspection, we went to Chongqing to sign technical agreement according to what Chongqing Electricity Company asked for.
By May 26, all the equipments our complex promised to deliver to An County Substation on May 28 had been sent out.
II. Relief Appeals / Relief, Product Deliver and Emergency Service
Since the May 12 Wenchuan Earthquake, China XD Group sales system has received and handled 65 customers’ appeals for relief, sent to the earthquake area more than 50 batches of equipment and products including 7 categories of products, such as breakers, isolating switches,
capacitors, lightning arresters and bushing shells, involving 8 production companies with the value RMB 10,153,600 Yuan. All the relief products have been sent to the harder-hit areas in Sichuan, Gansu and Shaanxi (detailed account of earthquake relief companies and equipment can be seen in the attached tables). Up to November 18, among the 65 appeals, the account of 51 items had been settled with the value RMB 7,104,700 Yuan in all, the contracts of another 11 items totaling RMB 1,066,400 Yuan had been signed, and 3 items valued at about RMB 1,982,500 Yuan were under discussion for contract.

Company

Relief Equipment (Products) Amount (Yuan)

Xi’an High Voltage Apparatus Co., Ltd.

3,183,300

Xi’an XD Transformer Co., Ltd

1,834,000

Changzhou XD Transformer Co., Ltd

50,000

Xi'an XD Power Capacitor Co., Ltd.

2,381,200

Xi'an XD High Voltage Porcelain Co., Ltd.

997,200

 XD Lightning Arrester Co., Ltd.

908,000

Xi'an Cable & Electrical Equipment Co., Ltd

800,000

Total

10,153,600

During the earthquake relief work, 10 companies of XD Group set up earthquake relief service teams with 120 persons. Among them:

Company

Members in Relief Service Team

Xi’an High Voltage Apparatus stock company

19

Xi’an High Voltage Apparatus Co., Ltd.

13

Xi’an XD Transformer Co., Ltd

20

Changzhou XD Transformer Co., Ltd

12

Xi'an XD Power Capacitor Co., Ltd.

10

Xi'an XD High Voltage Porcelain Co., Ltd.

5

XD Lightning Arrester Co., Ltd.

5

Xi'an High Voltage Apparatus Research Institute Co., Ltd.

9

Xi'an Electro-ceramic Research Institute Co., Ltd.

11

Xi'an XD Power Rectifier Co., Ltd.

16

Total

120

Our Company has more than 60 people taking part in the relief service. They engaged directly in the examination, replacement and adjustment on the key project sites at Cheng County Transformer Substation of Gansu, Bikou Transformer Substation of Longnan, Zipingpu Hydropower Plant of Sichuan, Jiangyou Hydropower Plant of Sichuan, An County Transformer Substation of Mianyang, Sichuan.
 